The FS 250 drilling rig is at work in Saharan desert zone for geophysical researches.

It was a great satisfaction for Fraste supplying a new FS 250 drilling rig last October 2015 to a worldwide customer, leader in the geophysical research.

This customer already bought in 2003 one of our drilling rig for seismic research and now with the second unit he is confirming his appreciation for Fraste production.

His request was for a rig designated to geophysical research capable of working under extreme conditions, especially in Sahara desert areas, highly liable and able to move on rough terrains, without traced roads: practically highly agile, fast and at the end powerful.

The drilling rig had to be able to work at high temperatures, in very dusty ambient and it needed an adequate cooling system and air/oil filtering system, suitable to face severe environmental conditions.

About the author

4 Responses
  1. I ѕtill cannot quite think I could possibly be one of tһose studying thee important recommendations found on your web site.

    My family and I are sincerely tһankful on youг generosity and for giving me the opportunity to pursue the chosen profession path.

    Мany thаnks foг the important information I mɑnaged to get from your web-site.

  2. Wе are a group of volunteers annd starting a new scheme in оur community.
    Y᧐ur site provideⅾ us with vаluable info to work on. Yoᥙ’ve done an impressive job and our whole community will be thankful to you.

Leave a Reply